
Grupo: Trelleborg

Excertos do catálogo

Tugger Winch TRELLEBORG’S Tugger Winch The new generation of mooring line heaving systems now offers improved safety and reliability. For safe mooring operations it is imperative that heaving lines are in good condition. The use of poorly maintained or damaged heaving lines can result in breakages, endangering mooring crews or jetty personnel operating within the snap-back zone. As an alternative to the traditional capstan, the heaving line is retrieved and spooled onto the enclosed drum of the “tugger winch”. This enables the jetty owner / operators to control maintenance, providing increased safety and efficiency of mooring operations. The integral tugger winch improves safety and efficiency of mooring line retrieval for onshore & offshore applications. Benefits ❙ Remote control “hands free” line retrieval further increases safety and convenience for operators. ❙ Clutch to disengage drive for free spooling during payout and match the ships winch or line boat. ❙ A built in torque limiting clutch further reduces the risk of fouled lines parting during retrieval and payout. ❙ Spooling device for retrieval; automatically lays the heaving line neatly on the drum. ❙ The tugger winch may be fitted integral to the Trelleborg quick release hook base structure, reducing jetty space requirements and obstruction on the dolphin. Alternatively the winch can be supplied as a free standing unit. ❙ Storage of heaving lines is within the winch drum, keeping dolphin tops and walkways clear of heaving lines, reducing the risk of tripping and entanglement. ❙ Enclosed tugger winch drum offers increased protection from the environment, extending heaving line operating life. ❙ A rotational swivel and rope guide allows retrieval from any direction. ❙ A built in auxiliary capstan head provides traditional capstan winch operation. Certified Management System DAM-CTW-01 Ver 4.0 Trelleborg Marine Systems’ commitment to continuous product improvement means that we reserve the right to upgrade and modify equipment and systems without notice as technological and ope
Abrir o catálogo na página 1
1.3 Holding Capacity 1.4 Drum Capacity 1.5 Support Structure 1.6 Key Standard Features 1.7 Weight Typically 1000kg (Torque limited) Pay Out : Free spooling to match ships winch or line boat Pay In : Variable speed from 10 - 45m/min Approx. 1.5 Ton (automatic “failsafe” disk brake on motor) 120m of 14mm Dyneema (HMPE) rope Integral Mounting With Hook Base Structure or free standing Refer to data sheet DAM-QRH-01 Auxiliary capstan winch to haul separate messenger and heaving lines Stainless steel lockable and hinged cover over assembly Spooling device Free spooling payout 500kg with control...
Abrir o catálogo na página 2Todos os catálogos e folhetos Trelleborg Marine and Infrastructure
-
SafePilot brochure
20 Páginas
-
TSX5 Shaft Power Meter brochure
9 Páginas
-
Docking & Mooring
88 Páginas
-
Pneumatic Fender infographic
1 Páginas
-
Pneumatic Fenders brochure
28 Páginas
-
Fender Application Design Manual
88 Páginas
-
Multipurpose and Tug Fenders
44 Páginas
-
Rolling Fenders and Safety
18 Páginas
-
AutoMoor Brochure
24 Páginas
-
Fender Systems
86 Páginas
-
DynaMoor
20 Páginas
-
Bollards
28 Páginas
-
Solid SmartFender Factsheet
2 Páginas
-
Ship-Shore Links Factsheet
4 Páginas
-
Navigating & Piloting Factsheet
2 Páginas
-
SmartDAS Factsheet
2 Páginas
-
SmartPort by Trelleborg Factsheet
2 Páginas
-
TRELLEBORG DYNAMOOR
4 Páginas
-
SmartDock ® Display Board
4 Páginas
-
Surface Buoyancy
24 Páginas
-
SmartMoor Series II
7 Páginas
-
Performance Monitoring
3 Páginas
-
Universal Safety Link
3 Páginas
-
TRELLEBORG’S Low Maintenance Hook
2 Páginas
-
LNG Infographic
8 Páginas
-
SafePilot CAT ROT-I-XT User Guide
17 Páginas
-
SafePilot User Guide
30 Páginas
-
SafePilot Shore Viewer User Guide
13 Páginas
-
SafePilot Piloting with One Touch
16 Páginas
-
Safepilot SmartPort System
16 Páginas
-
ReadyMoor Quick Release Hooks
6 Páginas
-
Docking, Mooring & Transfer for LNG
20 Páginas
-
Combined ESDS & SSL
3 Páginas
-
Ship Shore Link System
3 Páginas
-
Emergency Shutdown Link
3 Páginas
-
Floating Fenders
48 Páginas
-
Prelude LNG
1 Páginas
-
AutoMoor Datasheet
4 Páginas
-
SmartMoor Quick Release Hooks
8 Páginas
-
SafePilot CAT XT System
2 Páginas
-
SafePilot CAT II CAT III System
2 Páginas
-
SafePilot CAT I Beidou System
2 Páginas
-
Case Study - Singapore LNG Terminal
1 Páginas
-
Case Study - LNG terminal, China
1 Páginas
-
Whitepaper - Correction Factors
10 Páginas
-
Mini Guide - Foam Fenders
5 Páginas
-
Buoy Range Table
2 Páginas
-
Docking & Mooring Aftersales Service
2 Páginas
-
Hawser Hooks
6 Páginas
-
Guide - Fenders
8 Páginas
-
Barometer Report 3
16 Páginas
-
Barometer Report 2
7 Páginas
-
Whitepaper - Avoid the Disconnect
12 Páginas
-
lload monitoring software
2 Páginas
-
lload monitoring systeme
5 Páginas
-
Remote Release System
6 Páginas
-
Capstans
4 Páginas
-
Accessories
10 Páginas
Catálogos arquivados
-
Docking and mooring
2 Páginas