
Grupo: Trelleborg

Excertos do catálogo

Product Data Sheet / Reference no. OIM-CSH-01 Ver 3.0 Hawser Hooks for Tandem or Single Point Mooring Hawser Hooks Description This document describes mooring system options that may be installed on board an F(P)SO for Tandem Mooring or for bow mooring to a Single Point Mooring facility. Trelleborg Hawser Hooks and control systems have been installed in over 100 F(P)SO facilities for Tandem Mooring ofoading applications and may include the hawser and hawser winch. Quick Release Hawser Hooks are generally used as the anchorage points for the mooring hawser’s chafe chains and other options can include emergency quick release, load monitoring and a remote central control system. Additions to the Tandem Mooring may also include a Hawser Storage Winch referred to in Sections 7. FEATURES • Positive locking, resetting and release operations, with security against inadvertent or accidental release. • Load Monitoring & High Load Warning System designed for ship board operation. • Emergency Release, local or remote release from the Cargo Control Room (CCR) panel.
Abrir o catálogo na página 1
Product Data Sheet/ Reference no. OIM-CSH-01 Ver 3.0 Mooring Requirements: Tandem Mooring & SPM (Ref Note 1)
Abrir o catálogo na página 2
Product Data Sheet / Reference no. OIM-CSH-01 Ver 3.0 Compliance with Class & other Guidelines Tandem Mooring or Bow Mooring to Single Point (SPM). OCIMF Mooring Equipment Guidelines (MEG 3) 2000 Appendix E. OCIMF Recommendations for Equipment Employed In The Bow Mooring of Conventional Tankers at Single Point Moorings 2007. DNV, ABS, BV, Lloyds or RINA as applicable 2 HAZARDOUS AREA COMPLIANCE 2.1 Area classication The equipment will be supplied with certicicates for Hazardous Area Zone 1 or Zone 2 compliance where applicable or as specied. 3 QUICK RELEASE HAWSER HOOKS Refer to Table 1....
Abrir o catálogo na página 3
Product Data Sheet / Reference no. OIM-CSH-01 Ver 3.0 5 LOAD MONITORING SYSTEM Trelleborg manufactured load cell installed in each hook Stainless steel construction 5.1 Load Cells Calibrated integrally with hooks 0 to SWL Accuracy +/-2% BSL Dual gauged load cells. Local Display Unit A panel mounted display unit with LCD readout of load magnitude and load warnings supplied as standard. Generally located within the CCR or Bridge to monitor, display and record load and alarm history for each hook Unless otherwise specied CCR is assumed a non hazardous area and assumed to be an air conditioned...
Abrir o catálogo na página 4
Product Data Sheet / Reference no. OIM-CSH-01 Ver 3.0 7 HAWSER DEPLOYMENT AND STORAGE WINCHES Hawser hooks can be integrated with Trelleborg Horizontal or Vertical drum hawser winches. 7.1 Tandem Winch integration Winch options may be designed as: • Single section drum for hawser only storage Refer to Data Sheet OIM-WNR-02, OIM-WNR-04 & OIM-WNR-06 8 SURFACE TREATMENT Class 2.5 Blast to AS 1627.4 75 Microns Epoxy Primer 8.1 125 Microns High Build Epoxy containing MIO 75 Microns Polyurethane top coat. Finished Colour Yellow (RAL 1004) unless specied otherwise. 9 POWER AND CABLE REQUIREMENTS...
Abrir o catálogo na página 5
Product Data Sheet / Reference no. OIM-CSH-01 Ver 3.0 11 QUALITY 11.1 Accreditation 11.2 Material Traceability 11.3 Inspection and Test Plan (ITP) Trelleborg Marine Systems Melbourne ISO 9001 2008 accredited with Lloyds Register. Class Survey and material certicates provided for all structural materials Provided with Vendor Post Award documentation package submitted for client approval. Post Award Vendor Technical Package Submitted for Client review and comment. Manufacturing Data Record (MDR) Manufacturing Data Record (MDR) provided at completion for fabrication, mechanical, materials,...
Abrir o catálogo na página 6Todos os catálogos e folhetos Trelleborg Marine and Infrastructure
-
SafePilot brochure
20 Páginas
-
TSX5 Shaft Power Meter brochure
9 Páginas
-
Docking & Mooring
88 Páginas
-
Pneumatic Fender infographic
1 Páginas
-
Pneumatic Fenders brochure
28 Páginas
-
Fender Application Design Manual
88 Páginas
-
Multipurpose and Tug Fenders
44 Páginas
-
Rolling Fenders and Safety
18 Páginas
-
AutoMoor Brochure
24 Páginas
-
Fender Systems
86 Páginas
-
DynaMoor
20 Páginas
-
Bollards
28 Páginas
-
Solid SmartFender Factsheet
2 Páginas
-
Ship-Shore Links Factsheet
4 Páginas
-
Navigating & Piloting Factsheet
2 Páginas
-
SmartDAS Factsheet
2 Páginas
-
SmartPort by Trelleborg Factsheet
2 Páginas
-
TRELLEBORG DYNAMOOR
4 Páginas
-
SmartDock ® Display Board
4 Páginas
-
Surface Buoyancy
24 Páginas
-
SmartMoor Series II
7 Páginas
-
Performance Monitoring
3 Páginas
-
Universal Safety Link
3 Páginas
-
TRELLEBORG’S Low Maintenance Hook
2 Páginas
-
TRELLEBORG’S Tugger Winch
2 Páginas
-
LNG Infographic
8 Páginas
-
SafePilot CAT ROT-I-XT User Guide
17 Páginas
-
SafePilot User Guide
30 Páginas
-
SafePilot Shore Viewer User Guide
13 Páginas
-
SafePilot Piloting with One Touch
16 Páginas
-
Safepilot SmartPort System
16 Páginas
-
ReadyMoor Quick Release Hooks
6 Páginas
-
Docking, Mooring & Transfer for LNG
20 Páginas
-
Combined ESDS & SSL
3 Páginas
-
Ship Shore Link System
3 Páginas
-
Emergency Shutdown Link
3 Páginas
-
Floating Fenders
48 Páginas
-
Prelude LNG
1 Páginas
-
AutoMoor Datasheet
4 Páginas
-
SmartMoor Quick Release Hooks
8 Páginas
-
SafePilot CAT XT System
2 Páginas
-
SafePilot CAT II CAT III System
2 Páginas
-
SafePilot CAT I Beidou System
2 Páginas
-
Case Study - Singapore LNG Terminal
1 Páginas
-
Case Study - LNG terminal, China
1 Páginas
-
Whitepaper - Correction Factors
10 Páginas
-
Mini Guide - Foam Fenders
5 Páginas
-
Buoy Range Table
2 Páginas
-
Docking & Mooring Aftersales Service
2 Páginas
-
Guide - Fenders
8 Páginas
-
Barometer Report 3
16 Páginas
-
Barometer Report 2
7 Páginas
-
Whitepaper - Avoid the Disconnect
12 Páginas
-
lload monitoring software
2 Páginas
-
lload monitoring systeme
5 Páginas
-
Remote Release System
6 Páginas
-
Capstans
4 Páginas
-
Accessories
10 Páginas
Catálogos arquivados
-
Docking and mooring
2 Páginas