Group: Trelleborg
Catalog excerpts
Trelleborg enhances its LNG track record in China “We needed a reliable solution that would not only stand the test of time, but came with the assurance of high quality aftercare. Due to Trelleborg’s unrivalled reputation and technical qualification, we knew they had the capabilities to meet our expectations and requirements.” Jie Kang, Equipment and Materials Procurement Manager, CNOOC Yuedong LNG Trelleborg Marine Systems was recently contracted by CNOOC Yuedong LNG to supply cargo transfer technology to a new LNG terminal development at Yuedong, China. This project, worth 10.3 billion Yuan, included the development of a new LNG terminal, a new LNG station and new wharfs and pipelines. With the terminal expected to have an annual processing capacity of two million metric tonnes, this was a massive project. Trelleborg Marine Systems supplied the following technologies for the project: Double and Triple Quick Release Hooks with hazardous area compliance Quick Release Hooks (QRH) enable mooring lines to be quickly and easily released, even under full load conditions. SmartHook® Mooring Load Monitoring Systems with electric remote release SmartHook® load monitoring provides jetty operators with real-time readings of the load on mooring lines. This enables them to assess the integrity of the berth and take action as needed. SmartDock® Docking Aid System SmartDock® is a family of docking aid systems (DAS) used by jetty operators and pilots to monitor the approach and docking of berthing vessels. Design is based on lasers, differential GPS or Real Time Kinematic (RTK) GPS technologies. SeaTechnik™ Ship Shore Link (SSL) The SMART fibre optic and SMART Electric SSL systems ensures compatibility for the Emergency Shut Down System (ESDS), Mooring Load Monitor (MLM) data and telecom system between the terminal and visiting vessel which is vital for the LNG transfer process. ”We are delighted that CNOOC has chosen to work with Trelleborg. We recognise that the safe, efficient transfer of LNG from vessel to terminal is key to their business. Their choice of our world leading Ship Shore Link and Docking and Mooring technology is testament to our industry expertise.” Richard Hepworth, President of Trelleborg Marine Systems Other products included: • A central integrated monitoring system • An environmental and oceanographic monitoring system TMS also supplied a Portable Handheld Unit (PHU) for dual berth installation and a Carry On Board (COB) laptop system for single berth installation. This project is the thirteenth in China to benefit from Trelleborg Marine systems’ market leading SeaTechnik™ SSL system. Implementing this technology ensures the terminal is compatible with the majority of the world’s LNGC fleet, helping to maximise the gas trading benefits of its assets in a hig
Open the catalog to page 1All Trelleborg Marine and Infrastructure catalogs and brochures
-
SafePilot brochure
20 Pages
-
Docking & Mooring
88 Pages
-
Pneumatic Fender infographic
1 Pages
-
Pneumatic Fenders brochure
28 Pages
-
Fender Application Design Manual
88 Pages
-
Multipurpose and Tug Fenders
44 Pages
-
Rolling Fenders and Safety
18 Pages
-
AutoMoor Brochure
24 Pages
-
Fender Systems
86 Pages
-
DynaMoor
20 Pages
-
Bollards
28 Pages
-
Solid SmartFender Factsheet
2 Pages
-
Ship-Shore Links Factsheet
4 Pages
-
SmartDAS Factsheet
2 Pages
-
TRELLEBORG DYNAMOOR
4 Pages
-
SmartDock ® Display Board
4 Pages
-
Surface Buoyancy
24 Pages
-
SmartMoor Series II
7 Pages
-
Performance Monitoring
3 Pages
-
Universal Safety Link
3 Pages
-
TRELLEBORG’S Tugger Winch
2 Pages
-
LNG Infographic
8 Pages
-
SafePilot User Guide
30 Pages
-
Safepilot SmartPort System
16 Pages
-
Combined ESDS & SSL
3 Pages
-
Ship Shore Link System
3 Pages
-
Emergency Shutdown Link
3 Pages
-
Floating Fenders
48 Pages
-
Prelude LNG
1 Pages
-
AutoMoor Datasheet
4 Pages
-
SafePilot CAT XT System
2 Pages
-
Whitepaper - Correction Factors
10 Pages
-
Mini Guide - Foam Fenders
5 Pages
-
Buoy Range Table
2 Pages
-
Hawser Hooks
6 Pages
-
Guide - Fenders
8 Pages
-
Barometer Report 3
16 Pages
-
Barometer Report 2
7 Pages
-
lload monitoring software
2 Pages
-
lload monitoring systeme
5 Pages
-
Remote Release System
6 Pages
-
Capstans
4 Pages
-
Accessories
10 Pages
Archived catalogs
-
Docking and mooring
2 Pages