AV - Tilt, Swivel and Swing Arm (A Series)
4Pages

{{requestButtons}}

Catalog excerpts

AV - Tilt, Swivel and Swing Arm (A Series) - 1

CONNECT • CREATE • INNOVATE The Southco Dynamic Mounting Arm • Enhances the user experience combining, smooth intuitive operation with secure holding • Precise operating efforts with no adjustment or maintenance • Integrated wire management for a clean look

Open the catalog to page 1
AV - Tilt, Swivel and Swing Arm (A Series) - 2

AV Series Dynamic Mounting Arm Tilt, Swivel and Swing Product Detail • Intuitive grab and move operation enhances the user experience Wire channel in open position No knobs or tools required to reposition the display Precise control of operating effort ensures ideal “feel” and eliminates “drift” Holds securely, even in applications with dynamic loading • Low profile in the stowed position Folds to within 50 mm of the wall • Snap-open channels simplify wire management Easy display installation and replacement • Factory assembled and ready for use Dimensions in millimeters (inch) unless...

Open the catalog to page 2
AV - Tilt, Swivel and Swing Arm (A Series) - 3

AV Series Dynamic Mounting Arm Tilt, Swivel and Swing • Smooth operation enhances the user experience • Adjust the display without knobs or tools • Holds securely in every position Step 1 Determine display weight and distance (d) from mounting surface to center of gravity. Display Weight Aluminum alloy, powder coated Performance Details Cycle performance: 20,000 cycles within ± 20% of static torque specification Max. dynamic working load: Model 101: 66N (15 lbf) Model 102: 98N (22 lbf) Average ultimate load: See table Part Number Part Number Example Display mounting surface to CG distance...

Open the catalog to page 3
AV - Tilt, Swivel and Swing Arm (A Series) - 4

AV Series Dynamic Mounting Arm Tilt, Swivel and Swing • Smooth operation enhances the user experience • Adjust the display without knobs or tools • Holds securely in every position Installation 1. Determine desired mounting location 2. Mark upper and lower mounting holes. For ideal hole location, mark upper hole first, then use a plumb line to ensure vertical orientation between the upper and lower holes a. For thru-bolt installation, drill or punch holes as indicated on trade drawing and install using 1/4-20 or M6 screws. b. For installation in wood studs, drill a 3/16 inch pilot hole and...

Open the catalog to page 4

All Southco catalogs and brochures

  1. ST series

    7 Pages

  2. AC - Cables

    4 Pages

  3. E3 VISE ACTION

    28 Pages

  4. MP - Pulls

    1 Pages

  5. GA - Gaskets

    1 Pages

  6. MT

    1 Pages

  7. DRAINS

    4 Pages

  8. THRU HU LLS

    5 Pages

  9. Rod holder

    3 Pages

  10. Eyes

    5 Pages

Archived catalogs

  1. TruHulls

    7 Pages

  2. Drains

    10 Pages

  3. Deck Hardware

    138 Pages