Ready for Tier III
6Pages

{{requestButtons}}

Catalog excerpts

Ready for Tier III - 1

Engineering the Future - since 1758.

Open the catalog to page 1
Ready for Tier III - 2

Ready for Tier III EGR retrofit on newbuildings The current IMO Tier III regulation will apply only to vessels keel laid after January 1st 2016, and as a retrofit installation will be rather comprehensive, MAN Diesel & Turbo has primarily investigated two different EGR Tier III solutions for MAN B&W two-stroke diesel engines. SMALL BORE Tier II Standard Tier III prepared Option 2 LARGE BORE

Open the catalog to page 2
Ready for Tier III - 3

Along EGR Tier III retrofit concept it is further important to consider along planning of new building: ■ Engine room space for EGR sub-systems such as RTU, WTS, SU, NaOH dosing tank, sludge tank ■ Ship central cooling system capacity, e.g. central cooler size, FW and SW pumps designed for future EGR Tier III operation Design cross-check for aux. power demand and switchboard layout of vessel

Open the catalog to page 3
Ready for Tier III - 4

OPTION 1: EGR Tier III DS (Design Specification) OPTION 2: EGR prepared Tier II DS (Design Specification) A solution fit for owners who definitely expect to retrofit A solution fit for owners who do not know whether a solution in the future, but who would like to postpone retrofit for Tier III is going to be relevant in the future. the first-cost expenses for sub-components. This solution entails that a parent engine of a certain This solution only includes making space in the engine vessel series is tested and certified as a Tier III engine room and ensuring tank capacity along with minor...

Open the catalog to page 4
Ready for Tier III - 5

Visit www.marine.man.eu/two-stroke/ceas to use MAN Diesel & Turbo's engine calculation tool. The Emission Project Guide will give you further details of system, space and capacity planning. Based on this EGR Tier III preparation concept paper, MAN Diesel & Turbo is offering the full services required for converting the engine to comply with Tier III requirements for EGR operation. MAN Diesel & Turbo retrofit project implementation are offered on request to include: Delivery of required components for retrofitting Control system update Commissioning of EGR system and EGR aux. systems Sea...

Open the catalog to page 5
Ready for Tier III - 6

All data provided in this document is non-binding. This data serves informational purposes only and is especially not guaranteed in any way. Depending on the subsequent specific individual projects, the relevant data may be subject to changes and will be assessed and determined individually for each project. This will depend on the particular characteristics of each individual project, especially specific site and operational conditions. Copyright © MAN Diesel & Turbo. 1510-0258-00ppr Mar 2016 Printed in Denmark MAN Diesel & Turbo – a member of the MAN G

Open the catalog to page 6

All MAN Energy Solutions - Marine catalogs and brochures

  1. CP pro peller

    16 Pages

  2. EEDI

    12 Pages

  3. LNG Shipping

    15 Pages

  4. ME Engines

    8 Pages

  5. EPROX

    2 Pages

  6. Cruise & Ferry

    17 Pages

  7. MAN Cryo

    12 Pages

  8. MAN L51/60DF

    2 Pages

  9. L27/38

    16 Pages

  10. L16/24

    16 Pages

  11. OBC Vessels

    4 Pages

  12. 48/60

    7 Pages