OFFSHORE & ENGINEERING OFFSHORE & ENGINEERING 1, Jeonha-dong, Dong-gu, Ulsan, Korea TEL. : 82-52-230-1540, 1401 FAX.: 82-52-230-1976 ~ 7 E-mail : obdb@hhi.co.kr http://www.hhi.co.kr HOE-2005. 12 210mm X 297mm(Vent Nouveau)

Open the catalog to page 1
Offshore - 2

Contents Who we are 5 YARD & FACILITIES 6 ORGANIZATION 7 MESSAGE We provide what you want 10-13 FPSO 14-17 SEMI-SUBMERSIBLE UNIT 18-19 JACK-UP PLATFORM/DRILLING RIG 20-21 TOPSIDE MODULE & LIVING QUARTER 22 SUBSTRUCTURE 23 ON-GROUND SHIPBUILDING 24-25 OFFSHORE INSTALLATION 26-27 HOOK-UP & COMMISSIONING 28-29 SUBSEA PIPELINE 30 ONSHORE FACILITY 31 MARINE TERMINAL & JETTY We can satisfy you 34-35 DESIGN & ENGINEERING 36-37 RESEARCH & DEVELOPMENT 38 39 QUALITY MANAGEMENT HSE MANAGEMENT 40-41 AMENITIES 42-49 PERFORMANCE RECORD 50-51 GLOBAL NETWORK

Open the catalog to page 2
Offshore - 3

OFFSHORE & ENGINEERING 05 Who we are The Offshore & Engineering Division of HHI covers Engineering, Procurement, Construction, Offshore Installation and Project Management for all kinds of offshore oil and gas facilities. By combining the best yard facilities in the world with the creative talents of our employees, we persistently improve our capability to meet the future challenges in the offshore oil and gas industry. Yard & Facilities HHI’s Offshore Yard is located at Ulsan Port, which is 7 km away from its main complex in Ulsan, Korea. The yard spreads over 229 acres of paved area...

Open the catalog to page 3
Offshore - 4

Hyundai Heavy Industries Offshore & Engineering Industrial Plant & Engineering Engine & Machinery Electro Electric Systems Construction Equipment Research & Development Administration & Assistance Seoul & Overseas Offices Offshore & Engineering Division of HHI performed mainly offshore fabrication projects with its advanced yard facilities, permanent skillful labor and efficient construction management systems. Offshore facility projects included conventional fixed platforms, offshore installation This period, where Offshore & Engineering Division of HHI learned about the execution of...

Open the catalog to page 4
Offshore - 5

OFFSHORE & ENGINEERING 09 We provide what you want Since 1976, HHI has focused on continually improving its ability to design, construct, install and commission offshore projects on an EPIC basis. Today, our experience ranges from conventional platform and pipeline field developments to state-of-the-art FPSO projects. Our motto is to design facilities that our client really want. We strive to develop the means to effectively build, deliver and commission the project.

Open the catalog to page 5
Offshore - 6

The recent emphasis in offshore deepwater projects has Led to an increased demand for floating production systems such as FPSOs, FSOs, FPUs, PDQs, etc. These projects are ideally suited for HHI, since it meets the need for hull structure fabrication with topside process module fabrication. HHI entered the FPSO market in 1996 with two EPC contracts from Petrobras for the conversion of a VLCC and a VLOO to complete the P-33 and P-35 FPSOs. Both FPSO units were successfully commissioned and are being operated in the Marlim field of the Campos Basin, offshore Brazil. Given the successful...

Open the catalog to page 6
Offshore - 7

OFFSHORE & ENGINEERING 13 FPSO(Floating Production Storage & Off-Loading) Petrobras, P-33 & P-35 FPSO ELF, Amenam FSO Load Out ELF, Amenam FSO On-ground Building BP, Plutonio FPSO Dock Out ExxonMobil, Kizomba A FPSO ExxonMobil, Kizomba B FPSO

Open the catalog to page 7
Offshore - 8

Semi-submersible drilling rigs have been traditionally built in a drydock. However, starting with the BP Harding PDQ project in 1993 and the Troll C FPU hull project in 1998, HHI has developed construction methods that will allow these hull-type structures to be built on land, and safely loaded onto a dock-side transport vessel. For the construction of a drilling semi-submersible, one additional construction method had to be developed, now known as the Super-Lift operation. The Super-Lift operation involves building the complete deck of the floating facility at ground elevation. Thereafter,...

Open the catalog to page 8
Offshore - 9

OFFSHORE & ENGINEERING 17 Registered in the Guinness Book Offshore & Engineering Division (OED) of HHI has developed and owns a unique technology for constructing large offshore structures on the yard instead of in a drydock. OED’s so-called “On-ground Build” method has been verified by oil majors through the construction of Semisubmersible rigs, Jack-up rigs, FSO and other huge offshore facilities. Sedco 711, 1982 Sedco 714, 1983 Transocean 8, 1987 Ocean America, 1998 Sonat Arcade Frontier, 1990 Troll-C FPU Hull, 1998 Especially, HHI lifted the 12,112 ton topsides for Na Kika FPU project...

Open the catalog to page 9
Offshore - 10

The fabrication programs for the semi-submersible drilling rigs built upon the earlier techniques allowed HHI to fabricate jack-up drilling rigs onshore. Traditionally, moving these hull-type structures outside the marine environment would cause the hulls to be over- stressed during the operations. HHI overcame this limitation by supporting the hull on hydraulically activated skidshoes during the loadout operation, thereby allowing the deflections and deformations of the foundations and transport vessel to be accommodated by movements in the hydraulic supports, as opposed to otherwise...

Open the catalog to page 10
Offshore - 11

OFFSHORE & ENGINEERING 21 Topside Module & Living Quarter Since the first Champion-7 gas compression module was fabricated for Brunei Shell Petroleum in 1980, more than 400 topside modules and living quarters have been fabricated at the HHI offshore yard for various clients around the world. Modern construction facilities and advanced technology enable HHI to provide any kind of topside modules and living quarters for offshore platforms on a turnkey basis. With an efficient management system as well as highly skilled and experienced workforce, HHI is fully prepared to meet the needs of...

Open the catalog to page 11
Offshore - 12

OFFSHORE & ENGINEERING 23 Substructure On-ground Shipbuilding HHI has fabricated more than 600,000 metric tons of offshore jackets, steel GBS and other subsea structures at the offshore yard since 1976. Based on its accumulated experience and capability, HHI has been well recognized as the most reliable contractor for providing a quality product, especially for super size substructures. Offshore & Engineering Division of HHI came up with the new shipbuilding method to build commercial ships on ground instead of in conventional dry docks. HHI has successfully been building sixteen (16)...