1. Catalogs
  2. Flexifoil
  3. fusion2 5th line
video corpo

fusion2 5th line

fusion2 5th line

fusion2 5th line

Product catalog summary
Fusion2 5th Line Setup Instructions
Pack Contents:
  • 5m 5th line section attached to a 15m flying line section.
  • Large stainless steel ring.
Setup Procedure:
  1. Remove the stainless steel ring and untie the knot from the end of the rope.
  2. Thread the rope with the 5cm piece of tape through the middle of the swivel.
  3. Ensure the rope lays on the cleat side of the depower strap.
  4. Thread the end of the 5th line through the center hole in the bar, ensuring it is not twisted around the center line.
  5. Thread the 5th line through the ring on the bottom of the center line.
  6. Tie a knot in the end of the 5th line next to the tape.
  7. Larkshead the stainless steel ring onto the end of the rope.
  8. Attach the leash to the ring on the end of the 5th line and check all lines are the same length.
Line Length Check:

Attach all flying lines to a fixed point and put the bar in the full power position. Walk back until the lines are fully extended. Ensure all lines have equal tension to confirm equal length.

Adjustments:
  • If a main line is not the correct length, adjust by changing the length of the leader line on the bar.
  • If a center line is not the correct length, adjust by retying the knot on the spinning swivel above the depower strap.
Contact Information:

Flexifoil International Limited, 27 Regal Drive, Soham, Cambridgeshire, CB7 5BE, UK. Email: [email protected], Web: www.flexifoil.com

Version 2.0 © FLEXIFOIL INTERNATIONAL LIMITED 2006
See more

Catalog excerpts

fusion2 5th line-1

5th Line Instructions 2007 (VERSION 2) g. 1 - Pack contents g. 2 - BEFORE / AFTER g. 3 5th line 5th line 1 (g. 1) Pack contents: 1) 5m 5th line section attached to 15m ying line section. 2) Large stainless steel ring. (g. 2) Remove the stainless steel ring, and untie the knot from the end of the rope. 2 g. 4 g. 6 g. 5 Cleat 5th line (g. 3) Thread the rope with the 5cm piece of tape on it through the middle of the swivel. 5th line (g. 4) Make sure the rope lays on the cleat side of the depower strap as shown. (g. 5) Thread the end of the 5th line through the centre hole in the bar ensuring the 5th line is not twisted around the centre line. 5th line (g. 6) Thread the 5th line through the ring on the bottom of the centre line. Fusion2 5th Line Setup 5th line

 Open the catalog to page 1
fusion2 5th line-2

5th Line Instructions 2007 (VERSION 2) (g. 7) Tie a knot in the end of the 5th line next to the tape. g. 7 g. 8 (g. 8) Larkshead the stainless steel ring on to the end of the rope. (g. 9) Attach the leash to ring on the end of the 5th line and check all the lines are the same length. To check the length of your lines, we recommend you attach all ying lines to a xed point and put the bar in the full power position. Walk back until the lines are fully extended. If all of the lines have equal tension, your lines are of equal length. If one of your main lines is not the correct length, adjust it...

 Open the catalog to page 2

All Flexifoil catalogs and brochures

  1. Blade_V

    1  Page

  2. Stacker

    1  Page

  3. Quark

    1  Page

  4. Kiteboards

    1  Page

Archived catalogs

  1. ATOM 08

    25  Pages

  2. Sabre 2

    23  Pages

  3. Ion 2

    31  Pages

  4. Fusion 2

    19  Pages

  5. Blade IV

    28  Pages

  6. Atom

    25  Pages

  7. Axis kite bar

    19  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.