ESTA LEI ROS NAVAIS DE PENICHE SA Estaleiros Navais de Péniche, S.A. TUNA FISHING VESSEL 26.00 m Total units built: 10 Construction Year: 2001 (1st unit) Port: Sao Vicente, Cape Verdelslands Owner: Cape Verde Government, INDP Operator: INDP Designer Estaleiros Navais de Péniche Builder: Estaleiros Navais de Péniche Superstructure material: GRP Sandwich Main engine: Caterpillar 3412TA / 447kW Auxiliary engines: CumminsGenerators: 2 x 100KVA Reduction gearbox: Reintjes WAF 264 Maimum speed: 11 knots Hydraulics supplied by: Talleres Rouco, Vigo Hydraulics installed by: Estaleiros Navais de Péniche Electronics supplied by: Furuno Electronics installed by: Sema Radar: Furuno 1942 64 MN; Furuno 1712 24 MN Echo sounder: 2 x Furuno FCV291; FCV581 Weatherfax: Navtex- Furuno Auto pilot: Robertson AP 35 Magnetic compass: Cassens & Plath - Reflecta 4 Steering gear: Equipamar, Portugal Refrigeration system supplied by: Water chiller and colts Refrigeration system installed by: Electro-refrigeraçào Valentim Net hauler Talleres Rouco, 3400 kg Anchor winch: Talleres Rouco, 1500kg Crane: Talleres Rouco, 2000 x 2m Paints: Hempel Refrigerated fish hold capacity: 35 m3
Open the catalog to page 12 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page