
Attach the tech box securely to a flat area on the back of the board.
Using a rope, measure two lengths as illustrated:
Route the cable close to the board and mast to ensure it lies flush with the components after installation.
Tip: Position the motor approximately 20-25 cm from the board to provide support and ensure it protrudes from the water when fouled.
Add lengths X and Y to determine the total cable length required. When ordering, it is recommended to select a longer cable length to allow for excess cable to be wound up if not needed.
This sheet provides guidance on determining the appropriate cable length for installation.
EASY DRIVE NOTICE SHEET CABLE LENGTH 1. Tape the tech box to a flat spot on the back of the board. 2. Measure 2 lengths with a rope (SEE PICTURE): From the rear edge of the mast, along the board, up to the position of the battery box (length X) and from the motor up the mast to the bottom of the board (length Y). Route the cable as close as possible to the board and mast so that the cable is flush with the components after installation. Aide: 20-25 cm from the board is the optimal position for the motor to provide support and stick out of the water once fouled. 3. Add length X and Y and specify the total when ordering. (It is best to choose a longer length as you can always wind up excess cable when it is not needed).
Open the catalog to page 1Lithium Ion Battery 12 Ah Nennspanung: 22,2V KapazitSt: 310Wh WARNING: Risk of fire, explosion and bums. Made by bw electronics GmbH
Open the catalog to page 214 Pages
24 Pages
12 Pages