| 1.1.5- External connections All the electrical connections must comply with the rules of safety existing in each country, with special care to the ground connection. Supply must be connected from a suitable circuit breaker using a cable adequate to the maximum operating load (see table C473). Also the seawater and fresh water pump lines should be done with a cable adequate to the power. Three phase compressors and pumps must be connected respecting the phase sequence of the three phases (RST). The internal connections are made respecting the phase sequence. |