video corpo

Offshore Integrated Mooring Brochure - 8 Pages

Mooring units

Quick release hooks (QRH), quick release hawser

hooks (QRHH) and chain stoppers (CS) are the

primary anchor points for securing mooring lines,

chafe chains and hawsers. Manufactured from

high-quality material to OCIMF guidelines, Trelleborg

Marine Systems' hooks and stoppers have proven to

be the industry benchmark in terms of strength and

reliability.

Quick Release Hawser Hooks

• For FSO and FPSO, bow and stern mooring

• Secure the end link of the mooring assembly or

mooring hawser eye

• Capacities range up to 850 t MBL

Chain Stoppers

• For FSO, FPSO bow and stern mooring or spread

mooring

• Secure the common link of stud link anchor

ranging from 76 to 110 mm diameter

• Capacities range up to 1030 t MBL

• Optional chain tensioner

Quick Release Hooks

• For FLNG ship-to-ship mooring, lightering and

offshore terminals

• Secure the mooring hawser soft eye and are

generally installed in multiple-hook configuration

with an integrated capstan

• Single hook capacities range from 60 t to 150 t

SWL

Design Features and Options

The following are common to all Trelleborg mooring

hooks.

• Positive locking to ensure the mooring unit does

not open inadvertantly when the mooring line is

loaded

• Can be released at any load from zero to full safe

working load

• Electo-mechanical interlocks to guard against

unintended release

• Load monitoring via integral load cell

• Local alarms for high load warnings

• Remote release system

• Alternative mounting options including welding and

bolting

• Optional telemetry system for load monitoring and

remote release

• Classification society approvals for Lloyds, DNV,

ABS, BV and RINA upon request.

Offshore Integrated Mooring Brochure
  1. P. 1

    VA Offshore Integrated Mooring Trelleborg Marine Systems Takes the pressure off
  2. P. 2

    Integrated mooring systems Trelleborg Marine Systems is dedicated to making offshore oil and FLNG mooring operations easier and safer. It is...
  3. P. 3

  4. P. 4

    Offshore mooring and docking system Trelleborg Marine Systems has addressed the shortcomings of conventional offshore GPS docking aid systems...
  5. P. 5

    SPM load monitoring system Hawser load monitoring is especially critical when vessels are moored via a single-point mooring (SPM) arrangement...
  6. P. 6

    Fenders and fender deployment As part of the complete offshore mooring package, Trelleborg Marine Systems supplies both pneumatic and foam-filled...
  7. P. 7

    Hawser retrieval winches Trelleborg Marine Systems developed both vertical and horizontal hawser winches in response to demand for a better system of...
  8. P. 8

    Trelleborg Marine Systems Takes the pressure offASIA PACIFICTrelleborg Marine Systems AustraliaTel: +61 2 9285 0200constantine.koutas@trelleborg.comTrelleborg...
Text version

All Trelleborg Marine Systems catalogues and brochures

  1. Fender Design

    48 Pages

    En
  2. Bollards

    10 Pages

    En
  3. Accessories

    10 Pages

    En
  4. Safety Products

    4 Pages

    En
  5. Harbour Marine

    12 Pages

    En
  6. Tug Fenders

    14 Pages

    En
  7. Modular Fenders

    16 Pages

    En
  8. Hydro Fenders

    12 Pages

    En
  9. Guide to Fenders

    4 Pages

    En