Catalogue 2007 link manual
www.sskiteboarding.com
print switch display
Page / 6
Contact the
Manufacturer
Where to buy
this product ?
SlingShot -
/ 6
See other catalogues for SlingShot
Text version of the page
5.
STEP 5
Attach the LE3 line to the 3rd attach­ment on the leading edge (LE3 attach­ment) with a larks head connection.
LE 3
/
7
STEP 6
Attach the front leader lines to the hang point knot ('V' line attachment) with a larks head knot. Pull tight.
STEP 7
Attach the Oneline cleat to your chicken loop unit with screws (shown in red for clarity).
STEP 8
Thread the Oneline grab line through the active stopper ball, down through the bar and into the Oneline cleat. Attach the wave grenade pin.
STEP 9
Unwind the 20 m fly line and attach it with a larks head knot to the Oneline grab line.
STEP 10
On the 17" bar (Link 9, 7, 5, 4). Adjust the yellow stopper ball to a further posi­tion about 10 cm from the ring. This will allow maximum de-power for your kite.
STEP 12
3
NauticExpo's Virtual Library: PDF Catalogues | Documentation | Boating Brochures | Manuals | Marine directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
pdf-page pdf ne En 2009-01-02-09