| The sequence of pictures shown on these pages demonstrates the easiness of the positioning of Resinex elastic beacons in diverse situations. The elastic beacons are transported to the site either completely or partially unassembled (picture 1). Depending on the needs, the assembly of the metallic part and concrete sinker which is linked to the mooring system can be done either on shore (picture 2) or at sea (picture 3). The elastic beacon (either fully or partially assembled) is transported by a floating pontoon to the exact point of destination and then positioned in the water. The mooring system pulls down the float, until only the upper part of the elastic beacon is visible above water (pictures 5,6,7,8 and 9). If necessary, the length of the telescopic pipe, can be perfectly regulated in the sea, until reaching the desired focal plane (picture 10). Finally, the signalling and/or monitoring systems are assembled, and then, the solar panels are permanently positioned in the best way in order to guarantee the optimum power supply of the system (pictures 11 and 12). |