Text version of the page
Text version of the page
NOTE > Close bypass valve on fluid section of pump for boats. (Turn clockwise to close). Refer to specific User Manuals for detailed component start-up and shut-down instructions. Before Operating the System 1. > Make sure all hose connections are tight and secure. 2. > Make sure to remove Cap plug from bottom inlet of Material Pump before attaching material pick-up hose. 6. > Connect main air supply to system. (GlasCraft re- commends a minimum of 3/8”dia. airline.) 3. > Fill Lube Cup at the top of fluid section half (½ ) full of suitable pump lube. 7. > Each new GlasCraft system has been fluid tested at the factory. Our pump test solution is red- colored DBP (Di-N-Butyl Phthalate). There may be a re-
sidual amount of DBP in system that should be-
evacuated before putting the unit into production. During the initial start-up, ½ to 1 gallon of material should be dispensed. This is typically adequate to remove the test material. If desired, the fluid pump can be flushed with a suitable cleaning solution to evacuate DBP before priming with material. 4. 8. > Review all service manuals, which contain detailed operation and safety instructions. Make sure the ball valves on manifold are off and regulators are dialed down to zero. (Turning regu-
lators counter-clockwise will dial them down.) 5. > 32
Operation
|