| [fig. 1) Pack contents: 1) 5m 5th line section attached to 15m Hying line section. 2) Large stainless steel ring. (fig. 2) Remove the stainless steel ring, and untie the knot from the end of the rope supplier. (fig. 3) Thread the rope with the 5cm piece of tape on it through the middle of the swivel. (fig. 4) Make sure the rope lays on the cleat side of the depower strap as shown. (fig. 5) Thread the end of the 5th line through the centre hole in the bar ensuring the 5th line is not twisted around the centre line. (fig. 6) Thread the 5th line through the ring on the bottom of the centre line. |