DC Freedom 30
22Pages

{{requestButtons}}

Catalog excerpts

DC Freedom 30 - 1

USER’S MANUAL DESSALATOR® DC FREEDOM D30 - 30 LITRES / HOUR DESSALATOR Technical and Sales Departments : Z.I des 3 Moulins – “Euro 92 – Bât. D – rue des Cistes – 06600 ANTIBES

Open the catalog to page 1
DC Freedom 30 - 2

2. How to install the desalinator: Sea water inlet Motor unit Membrane unit Control panel 5. Maintenance 5.1 Maintaining and 5.2 Rinsing the membranes 5.2 Rinsing the membranes 5.3 Sterilizing the membranes 5.4 High pressure pump 6. Spare parts and accessories page 10 page 10 page 11 Appendix: A1: Reverse osmosis A3: Sterilizing cartridge – Instructions for use

Open the catalog to page 2
DC Freedom 30 - 3

Installation Diagram Dessalator DC FREEDOM 30 12 V or 24V Diam. 10 N°3 Rinsing solenoid valve cable Diam. 12 N°8 Rinsing with pressurized fresh water Water line Fresh water tank Membrane Length: 700 Width: 100 Height: 120 Control panel Length: 320 Width: 200 Depth: 150 Motor unit Length: 500 Width: 320 Height: 220 Strainers need to be looking forward on the hull of boat Filter Width: 310 Height: 390 Depth: 340 Positive connection on relay with brown cable 35 mm² Rinsing solenoid valve control cable Sea water Fresh water HP hose pump membranes Negative connection on motor with green/yellow...

Open the catalog to page 3
DC Freedom 30 - 4

RINSE VALVE PRODUCTION VALVE CONTROL SWITCH MFSSAI ATfjR 282RuedeCistes, Batiment Euro92 DOC: RAC_DUO PAGE: 1/1 SHEET:

Open the catalog to page 4
DC Freedom 30 - 5

1. Components supplied with the Dessalator®: Version A5 Hull valve: It must be located the lowest possible in the boat, to the back for a motor yacht or in the centre near the keel for a sailing boat. The hull valve strainer filters out the larger particles at system entrance. Pre-filter: It must be located the nearest possible to the hull valve and be compulsory under the waterline. If not possible, there are a solution: to install a LP pump (optional). The pre-filter filters out solid particles down to 5 µm at the motor unit inlet. It is supplied with wrench. For automatic rinsing an...

Open the catalog to page 5
DC Freedom 30 - 6

2. How to install the watermaker: 2.1 Sea water inlet Sea water inlet valve: The strainer should be positioned as low as possible below the waterline and as far as possible from the deck waste oulet. Drill the hull  21mm. The grooves on the strainer should be facing forward (towards the bow) for maximum water intake when the boat is moving forward. Please seal watertight with Rubson mastic or Sicaflex. The hull valve should be accessible for maintenance. Make the valve / strainer and valve / hose connector watertight using 577 Loctite or Teflon tape. Recommendation: ensure that the...

Open the catalog to page 6
DC Freedom 30 - 7

2. How to install the desalinator: 2.2 Motor unit: The HP motor unit should be installed as low as possible in the boat in a horizontal position and it must be protected from water spray as much as possible. The unit is mounted using two brackets under the two motors leaving a few centimetres clear space around the unit, to get sufficient air circulation space for motor cooling. The connection between the prefilter1 oulet and the inlet to the low pressure side of the pump 2 is in Tricoflex hose of  12mm with doubled stainless jubilee clips at each joint. The HP head of the pump is...

Open the catalog to page 7
DC Freedom 30 - 8

2. How to install the desalinator: 2.4 Membrane unit The membranes can be installed horizontally, preferably flat or on a wall support. They are mounted using 8 Parker screws in stainless steel brackets1. As the hose from the HP pump2 vibrates, it is preferable to install the hose with an insulating tube. The HP connectors should be installed strictly in accordance with the instructions (Appendix A2). Apply a little loctite or nut seal to the two male and female cones before tightening. Recommendation: To facilitate the connection3, it is possible to rotate the heads through 90° by...

Open the catalog to page 8
DC Freedom 30 - 9

2. How to install the desalinator: 2.5 Control panel: 1 2 The control panel must be mounted on a vertical surface as close as possible to the motor / pump unit and to the membranes. Leave space behind the panel to facilitate the connections. It is recommended that it is installed at the bottom or on the sides of cupboards, under chart table or main cabin seats, on the front panel of a rear bunk, … The panel has the following water connections:  HP hose1  Production hose exiting the membranes (blue hose)2  Production hose from panel to tanks3: a 10mm inner  Tricoflex hose will be...

Open the catalog to page 9
DC Freedom 30 - 10

3. Starting the Dessalator: 1. Ensure the valves are open before starting up the desalinator (Hull valve and waste oulet valve if relevant) 2. To be done compulsory: For the first use, after the replacement of the filter, when lifting the boat out of the water or for a long period of not using your water maker, please fill the circuit with fresh water: put the handle valve on the pre filter to the back; this operation should be done for 3 or 4 minutes, water maker stopped and pressure captor open (fully anti-clockwise). Once the circuit is full of fresh water put the valve handle of the...

Open the catalog to page 10
DC Freedom 30 - 11

4. Directions for use: MEMBRANE, DELICATE COMPONENT Reverse osmosis membrane must be carefully maintained as they are the most delicate elements of the system. We recommend that the maintenance instructions are carefully followed to prevent the membranes from damage and to ensure the guarantee is not invalidated. Maximum production capacity of the desalinator is achieved with a sea water temperature of 25°C. The functioning of the membranes will vary depending on the temperature of the sea water and the sailing area. Output drops by approximately 2.5% to 5% for each degree below 25°C....

Open the catalog to page 11
DC Freedom 30 - 12

5. Maintenance: CAUTION: IN FREEZING CONDITIONS, PLEASE EMPTY THE FLOWMETER TUBE ON THE CONTROL PANEL BY DISCONNECTING THE PRODUCTION HOSE AND BLOWING OR INJECTING AIR INTO THE HOSE, PROTECT YOUR MEMBRANES WITH BLANKETS. 5.1. After 1,000 working hours, it is normal that the flow lowers between 10 and 15%. If more, you should think of replacing the membranes.  The volume of production of your watermaker can be made over the first 24 to 48 hours of operation. If the drinking water produced falls below the normal working specifications (sea water containing a TDS of 35,000 ppm, a sea water...

Open the catalog to page 12

All Dessalator catalogs and brochures

  1. DC Freedom 60

    21 Pages

  2. AC CRUISE 60

    1 Pages

  3. Freedom 100

    1 Pages

  4. D2000 SPE

    1 Pages

Archived catalogs

  1. DUO 100

    21 Pages

  2. DUO 60

    21 Pages

  3. D 60

    22 Pages

  4. D 100

    21 Pages

  5. D440-D1000

    16 Pages

  6. D 90 TO D 280

    21 Pages

  7. SOLO 100

    19 Pages

  8. SOLO 60

    19 Pages